What Is Included in a 100 Amp to 200 Amp Upgrade?
Scope differs project to project: some jobs are a panel swap, others involve the full service entrance, and utility work is coordinated case by case.
Existing Panel and Service Assessment
Work begins with documentation: the panel's rating, brand, and condition; the size and routing of the service entrance conductors; the meter equipment; and the grounding. That picture determines whether raising capacity means a new panel alone or the broader work of a service upgrade.
Load Calculation
A code-based load calculation tallies the home's circuits, applies demand factors, and adds planned equipment such as an EV charger or heat pump. The result drives the project: it confirms the home needs 200 amps and shows how much of that capacity will actually see use.
New Panel and Main Breaker
At the center of the upgrade sits a new 200 amp panel with a 200 amp main breaker, chosen with enough circuit spaces for current and planned loads. Existing circuits are reconnected and labeled, and the wall around the new cabinet is finished cleanly.
Service Entrance and Meter Equipment
When the service itself grows, work extends past the panel: larger service entrance conductors from the utility connection point, a meter socket rated for the new capacity, and often new conduit or a riser where the service enters the building. This utility-facing equipment carries its own scheduling.
Grounding and Bonding
Raising capacity brings grounding and bonding up to current requirements: grounding electrode conductors to the water pipe and ground rods, bonding of metallic water and gas piping, and correct bonding at the new panel and meter. Older services often predate these details entirely.
Permits and Inspections
Panel and service work is permitted electrical work, wherever it lands on that scope range. The City of Bothell Permit Center notes that electrical permits are obtained through Labor and Industries, which is how electrical permits are handled for Bothell addresses. We apply through L&I's system and schedule the closing inspection.